Advertisement

Maximum Employees to Be Invited to a Meeting - LeetCode 2127 Solution

Maximum Employees to Be Invited to a Meeting - Complete Solution Guide

Maximum Employees to Be Invited to a Meeting is LeetCode problem 2127, a Hard level challenge. This complete guide provides step-by-step explanations, multiple solution approaches, and optimized code in python3, java, cpp, c.

Problem Statement

A company is organizing a meeting and has a list of n employees, waiting to be invited. They have arranged for a large circular table, capable of seating any number of employees. The employees are numbered from 0 to n - 1 . Each employee has a favorite person and they will attend the meeting only if they can sit next to their favorite person at the table. The favorite person of an employee is not themself. Given a 0-indexed integer array favorite , where favorite[i] denotes the favorite person o

Detailed Explanation

The problem asks us to find the maximum number of employees that can be invited to a meeting given a list of each employee's favorite person. The employees will be seated at a circular table, and an employee will only attend if they can sit next to their favorite person. The input is an array `favorite` where `favorite[i]` is the favorite person of employee `i`. The output is the maximum number of employees that can be invited.

Solution Approach

The solution identifies two types of possible arrangements: 1. A cycle of length greater than 2. Any cycle means all the employees in that cycle can sit together. We iterate through the graph and find the longest cycle. 2. Chains connected to a 2-cycle (a pair of employees that like each other). For each 2-cycle `(a, b)`, we can include `a` and `b` plus the longest chains (paths) that lead into `a` and `b` but are not part of a cycle. The algorithm calculates these chains using topological sort.

Step-by-Step Algorithm

  1. Step 1: Calculate the in-degrees of each node in the graph. This helps identify nodes that have no incoming edges, which is useful for topological sorting.
  2. Step 2: Calculate the length of the longest chain ending at each node using a modified topological sort approach. Starting from nodes with an in-degree of 0, iteratively remove them and update the length of the longest chain ending at their favorite person.
  3. Step 3: Identify cycles in the graph. Iterate through the nodes, and for each unvisited node with a positive in-degree (part of a cycle), traverse the cycle to calculate its length.
  4. Step 4: If a cycle of length 2 is found (a mutual liking relationship), sum the longest chain ending at each of the two nodes in the cycle. These chains represents trees connected to this 'flower'.
  5. Step 5: If a cycle with length greater than 2 is found, update the maximum cycle length found so far.
  6. Step 6: Return the maximum of the largest cycle length (cycles of length > 2) and the sum of the lengths of all 2-cycle 'flower' chains.

Key Insights

  • Insight 1: The problem can be modeled as a directed graph where an edge `i -> favorite[i]` means employee `i` likes employee `favorite[i]`.
  • Insight 2: The optimal solution involves finding the largest cycle in the graph (cycles of length greater than 2) and combining it with the longest chains attached to 2-cycles (cycles of length 2).
  • Insight 3: Topological sort is helpful to process the graph by removing nodes with no incoming edges, which allows us to calculate the longest chain lengths leading to cycles.

Complexity Analysis

Time Complexity: O(n)

Space Complexity: O(n)

Topics

This problem involves: Depth-First Search, Graph, Topological Sort.

Companies

Asked at: Barclays, SAP.