Advertisement

Tallest Billboard - LeetCode 956 Solution

Tallest Billboard - Complete Solution Guide

Tallest Billboard is LeetCode problem 956, a Hard level challenge. This complete guide provides step-by-step explanations, multiple solution approaches, and optimized code in python3, java, cpp, c.

Problem Statement

You are installing a billboard and want it to have the largest height. The billboard will have two steel supports, one on each side. Each steel support must be an equal height. You are given a collection of rods that can be welded together. For example, if you have rods of lengths 1 , 2 , and 3 , you can weld them together to make a support of length 6 . Return the largest possible height of your billboard installation . If you cannot support the billboard, return 0 . Example 1: Input: rods = [1

Detailed Explanation

The "Tallest Billboard" problem asks us to find the maximum possible height of a billboard that can be supported by two steel supports of equal height. We are given a collection of rods with varying lengths. We need to divide these rods into two disjoint subsets such that the sum of the rods in each subset is the same. This common sum represents the height of each steel support, and therefore the height of the billboard. If it is not possible to create two such subsets, the answer is 0.

Solution Approach

The solution utilizes dynamic programming to efficiently find the maximum possible height. We use a map (dictionary in Python) `dp` where the key is the difference between the sums of the two partitions (left and right supports), and the value is the maximum sum achieved for the left partition (sum1) with that difference. We iterate through the `rods` array, updating the `dp` map in each step. For each rod, we consider adding it to the left partition (increasing the difference), or to the right partition (decreasing the difference). We update the `dp` map with the new differences and corresponding sums. The algorithm efficiently explores all possible combinations of rods to find the maximum possible height.

Step-by-Step Algorithm

  1. Step 1: Initialize a map `dp` to store the differences between the sums of the two partitions and the corresponding maximum sum of one of the subsets. Initialize `dp[0] = 0` because initially, the difference is zero and the sum is also zero.
  2. Step 2: Iterate through each `rod` in the `rods` array.
  3. Step 3: Create a copy `cur` of the `dp` map to avoid modifying the map while iterating over it.
  4. Step 4: Iterate through the `cur` map. For each entry (difference, sum1) in `cur`:
  5. Step 5: Add the current `rod` to the first partition. Update `dp[difference + rod]` with the maximum of the current value and `sum1 + rod`.
  6. Step 6: Add the current `rod` to the second partition. Update `dp[difference - rod]` with the maximum of the current value and `sum1`.
  7. Step 7: After processing all the rods, return `dp[0]` which contains the maximum possible height when the difference between the two partitions is 0. If `dp[0]` does not exist return 0.
  8. Step 8: In the C implementation, a custom hash table is utilized to perform dynamic programming due to the lack of built in hash map functionality. It also incorporates memory management, and ensures the proper initialization of entries to differentiate them from present values.

Key Insights

  • Insight 1: The problem can be modeled as finding two subsets of rods with equal sums. This is a variation of the subset sum problem.
  • Insight 2: Dynamic programming is an effective approach for solving this problem. We can use a map to store the difference between the sums of the two subsets and the corresponding maximum sum of one of the subsets.
  • Insight 3: The difference between the sums of the two subsets can range from -sum(rods) to +sum(rods). Thus, we need to keep track of all possible differences. The key in the dp map represents the difference.

Complexity Analysis

Time Complexity: O(n*sum(rods))

Space Complexity: O(sum(rods))

Topics

This problem involves: Array, Dynamic Programming.

Companies

Asked at: Atlassian.